Our Manufacturing Facility

Process control is how we protect your brand. From raw material inspection to final container loading, we build measurable quality into every stage of production.

4,950 m²
Facility Area
137
Skilled Workers
500K
Monthly Capacity
10
Production Lines

Certifications & Compliance

We meet the strict compliance requirements of the North American, European, and Australian markets.

BSCI
Social Compliance
ISO 9001:2015
Quality Management
REACH & RoHS
Material Safety

Quick Audit Request

Use this quick brief to request an audit, live tour, or pre-shipment review.

Advanced Machinery & Workshop

Precision starts with the right tools. We continuously upgrade the production lines to handle complex designs, heavy-duty fabrics, and airtight waterproof requirements.

  • CNC Fabric Cutting: Automated laser and blade cutting ensures zero-tolerance precision on pattern dimensions.
  • RF Welding Machines: 20+ high-frequency welding stations for seamless, 100% waterproof dry bags and coolers.
  • Computerized Pattern Sewing: Programmable stitching for complex logo embroidery, MOLLE webbing, and reinforced bar-tacks.
  • Testing Lab: In-house needle detectors, tensile strength testers, and hydrostatic pressure testing machines.
CNC Cutting Sewing Line RF Welding Testing Lab

Strict Quality Control (AQL 2.5/4.0)

Quality isn't inspected at the end; it's built into the process. We follow a 4-step QA protocol.

1. IQC (Incoming QC)
Every batch of fabric, webbing, and hardware is inspected for color fastness, thickness, and defects before entering the warehouse.
2. IPQC (In-Process QC)
Line supervisors conduct random hourly checks on stitching tension, seam allowance, and logo alignment during production.
3. FQC (Final QC)
100% visual inspection of finished bags. We check for loose threads, zipper smoothness, and structural integrity.
4. OQC (Outgoing QC)
Pre-shipment inspection based on AQL standards. We verify carton marks, drop tests, and pallet stability.

Quality Checklist & Resources

Download our standard operating procedures and templates to align with your purchasing team.

Factory Risk-Control Matrix

We control the most common failure points with clear checkpoints before they become shipment issues.

Risk Point Typical Issue Control Action Verification
Incoming fabrics Color/shade mismatch Lab dip + lot ID control IQC report + swatch signoff
Logo process Position drift / density inconsistency Placement templates + first-piece approval Inline image checks
Assembly line Dimension drift / seam defects Hourly IPQC checkpoints Tolerance logs + rework records
Packing & shipment Mixed labels / carton errors SKU packing list reconciliation OQC checklist + carton photos
Compliance audit preparation
Before Audit
We prepare line documents, material traceability files, and current QC logs for transparent review.
Live production validation
During Production
You can request milestone videos and third-party inspections at fabric, inline, and pre-shipment stages.
Shipment compliance handover
Shipment Handover
We deliver inspection evidence and packing data so your receiving team can process goods faster.

Ready to audit our production base?

We welcome third-party inspections (SGS, TUV, Intertek) and video tours via WhatsApp/Zoom. Let's discuss your production standards.

How our production is organised

Production is organised as a controlled programme across our production team, our SGS-verified production base and our vetted partner facilities. The core operating footprint includes 7 production lines, 149 machines, 137 people and our 4,950 m² SGS-verified production floor, with monthly capacity of 200,000 units.

Capacity alone does not determine where a style runs. Before line allocation, the team reviews material behaviour, seam construction, hardware, branding method, process sequence, quality risks and the approved delivery plan. A structured style with reinforced load points requires a different balance of cutting, preparation and sewing than a soft promotional item. The approved sample and bill of materials therefore become the basis for line setup rather than relying on a generic product description.

Our production team converts the programme file into material controls, operation instructions and inspection checkpoints. Incoming materials are matched to approvals before cutting. The first completed units are reviewed before normal line flow, and in-process findings are fed back to the responsible operation. Packing begins only after the product and presentation requirements are confirmed.

Our vetted partner facilities are used for approved specialist processes or capacity routing where their equipment and process controls fit the programme. Artwork, colour references, test requirements and acceptance standards travel with the work package. The project owner retains coordination of approvals, records and handovers, so the buyer receives one traceable programme rather than disconnected production steps.

Each production release has defined prerequisites. Materials and components must be available and matched to the controlled bill of materials; artwork and branding references must be approved; the sample status must be clear; and open technical comments must have an owner. If a prerequisite remains unresolved, the effect on the line plan and shipment milestone is made visible rather than hidden inside an optimistic schedule.

Line briefing connects the technical file to actual operations. The team reviews critical measurements, seam allowances, reinforcement points, component orientation, branding position and known workmanship risks with the responsible production and quality personnel. Visual references are used where written instructions could be interpreted in different ways. Findings from the first article are then used to adjust the operation method or checkpoint before normal flow.

Traceability is scaled to the programme and buyer protocol. Material identification, bundle or batch control, inspection status and packing records create a practical link between the released specification and completed goods. The objective is not paperwork for its own sake; it is to show what was approved, what was checked and who is responsible for an open action.

Line layout and capacity

The 7 production lines are planned around product construction and operation balance. Daily output is set after the approved sample has been broken into operations and a pilot run confirms the practical takt. This avoids presenting an invented universal rate for styles with very different complexity.

Production routing guide
Line typeSuitable categoriesTakt and daily-capacity approach
Structured bag lineLaptop bags, school bags and styles with padding, panels or reinforcementOperation-balanced takt; daily target confirmed from the approved pilot run
Soft bag lineTote bags, lightweight travel organisers and simple fabric constructionsContinuous-flow takt where material and branding processes are stable
Travel and gym lineTravel bags and gym bags with multiple compartments, webbing and hardwareSection-based balance with checkpoints before major assemblies are closed
Insulated construction lineCooler bags and related styles requiring insulation layer control and sealed componentsProcess-limited takt based on lamination, welding or seam requirements
Small-product lineCosmetic bags, wallets and compact accessory programmesBatch or cell flow according to component size and branding sequence
Special-process cellArtwork application, embroidery, welding and controlled component preparationScheduled to feed the main line without bypassing approval checks
Finishing and packing lineThread trimming, cleaning, metal detection where required, presentation and carton packingRelease-paced flow matched to final inspection and shipping-mark approval

The combined monthly capacity is 200,000 units. A programme reservation is confirmed against style complexity, material readiness, approved sample status and the live calendar; it is not calculated by dividing total capacity evenly across lines.

Equipment overview

The equipment mix supports cutting, sewing, specialist joining, branding, finishing and verification. The 149-machine total is considered together with operator skill, attachments, maintenance status and the product route; a machine count by itself does not guarantee a stable process.

Equipment categories and purpose
Equipment categoryPurpose
Automatic cutting systemDigitally controlled cutting for consistent panel shape, nesting and repeatability
Computerised sewing machineProgrammable stitch patterns for repeated reinforcement and defined operation control
Double-needle sewing machineParallel seams where spacing, appearance and structural consistency matter
Post-bed sewing machineAccess around shaped panels, piping, edges and three-dimensional assemblies
Ultrasonic welding equipmentJoining or sealing compatible synthetic materials for specified constructions
Printing equipmentApproved artwork application with controlled position, colour reference and curing checks
Embroidery equipmentRepeatable stitched branding based on an approved digitised artwork file
Needle detectorDetection control for applicable finished-product and buyer protocols
Tensile test standControlled pull checks for handles, straps, seams or fitted components against the programme method
Finishing and inspection stationsMeasurement, visual review, cleaning, presentation checks and packing verification

Critical settings and approved references are established during development or the first-article stage. Preventive maintenance and pre-use checks support consistency, while process-specific records provide evidence when a buyer protocol calls for documented verification.

Quality gates

Quality control is divided into gates so a problem can be contained close to the operation that created it. The approved sample, bill of materials, measurement points, workmanship criteria, artwork and packing specification form the common reference.

Quality control plan
GateControl focusRelease evidence
First article inspectionConstruction sequence, dimensions, seam appearance, reinforcement, branding position, hardware and functionFAI record and authorised release before normal line flow
In-process quality controlIPQC patrol checks at risk operations, with findings isolated and corrected at the responsible stagePatrol record, defect disposition and corrective feedback
Final inspectionWorkmanship, measurements, function, labelling, assortment, packing and carton marksISO 2859-1 sampling result at AQL 2.5, or AQL 1.5 when agreed
Third-party inspectionIndependent review against the purchase order, approved sample and buyer checklistInspection report from the buyer's nominated inspection body

A failed gate is not treated as a paperwork exception. Affected goods are identified, the cause is reviewed, corrective work is verified and release status is updated. When testing is required, the sampling point and laboratory evidence are linked to the relevant material or finished product rather than filed as a generic document.

Defect information is used to control recurrence. The team distinguishes an isolated repair from a process condition that can affect the remaining lot. For a process issue, containment can extend to work in progress and completed goods, followed by verification of the corrective method. Release occurs only when the defined gate is satisfied and the programme record reflects the disposition.

Audit and certification

System, social and product evidence are reviewed according to scope. ISO 9001 supports quality-management governance, while ISO 14001 addresses environmental-management controls. amfori BSCI and Sedex SMETA provide recognised social-audit frameworks for covered facilities and reporting periods.

Document review includes the named site, audit or certificate scope, issuing body, report date, validity period and any corrective-action status. A certificate is not assumed to cover every material, process or location. Product-level evidence is separately matched to the approved specification and destination-market requirement.

Buyer-nominated third-party inspection is welcome. SGS, Intertek, Bureau Veritas (BV) and TÜV may be appointed to inspect against the purchase order, approved sample, packing requirements and agreed ISO 2859-1 sampling plan. The buyer or appointed body should issue the checklist and booking instructions early enough for access, sample selection and report review to fit the shipment plan.

Where material claims or restricted-substance controls apply, the programme may also review REACH (EC 1907/2006), California Proposition 65, CPSIA, OEKO-TEX Standard 100 or GRS evidence as relevant. Requirements should be defined before sample approval so the selected materials and document route are aligned from the start.

What a visit covers

A planned visit follows the actual control flow rather than presenting isolated equipment. The route can be adjusted to your programme and confidentiality requirements.

01
Programme briefing

Review the intended product, approved status, production schedule and visit scope.

02
Material control

See receiving, identification, approval matching, storage and issue records for programme materials.

03
Cutting and preparation

Follow pattern control, panel cutting, component preparation and bundle identification.

04
Line execution

Observe operation breakdown, workstation instructions, attachments and in-process handling.

05
Special processes

Review approved branding, embroidery, welding or other relevant process controls.

06
Quality records

Examine FAI, IPQC, defect control, measurement and final-inspection records.

07
Finishing and packing

Check cleaning, presentation, assortment, labelling, carton marks and release status.

08
Close-out discussion

Record observations, open actions, owners and the evidence needed for closure.

Buyer representatives and nominated third parties are welcome to conduct a facility audit or programme inspection with an agreed agenda. Advance scheduling protects confidentiality, confirms access to relevant records and ensures the right technical owners are available.

Plan a production review

Share your product, quality protocol, preferred visit scope and target schedule. We will align the agenda with the relevant production and quality stages.

Frequently Asked Questions

How much monthly output can your production planning reserve for one programme?

Planning reserves against style complexity, material readiness and the live calendar rather than dividing 200,000 monthly units evenly. Our 4,950 m² SGS-verified production floor and 7 production lines are scheduled after the pilot run confirms takt, and you receive dated milestones for line start, inspection and booking.

How are the seven production lines allocated between different constructions?

Allocation follows construction: structured bags, soft bags, travel and gym builds, insulated items, small products, a special-process cell and finishing. Our production team reviews material behaviour, seam type, hardware and branding method before assigning one of 7 production lines, then confirms the daily rate from a pilot run rather than a generic average.

What equipment sits behind the 149-machine count on your verified floor?

The count covers automatic cutting, computerised and post-bed sewing, ultrasonic welding, printing and embroidery equipment, plus needle detectors and tensile test stands. Machine count alone proves nothing. Our production team pairs the 149 machines with operator skill, maintenance status and the approved process route for your style.

Which sampling standard governs the final inspection of a finished lot?

Final inspection follows ISO 2859-1, equivalent to ANSI ASQ Z1.4, at general inspection level II. The standard acceptance basis is AQL 2.5, with critical defects at 0, major at 2.5 and minor at 4.0, and a written report is issued before shipment release is requested from us.

How are defects classified during a final inspection at AQL 2.5?

Defects are grouped by severity: critical failures affecting safety or function, major faults a customer would reject, and minor workmanship issues. At AQL 2.5 with level II sampling, critical is accepted at 0, major at 2.5 and minor at 4.0, and a failed lot is contained and re-verified.

Which social compliance audits can be arranged for a covered facility?

Social review can reference amfori BSCI and Sedex SMETA reports for covered facilities and reporting periods, alongside ISO 9001 for quality governance and ISO 14001 for environmental controls. Each document is checked for named site, scope, issuing body, report date and any open corrective action before submission.

Can I appoint SGS, Intertek or Bureau Veritas for pre-shipment inspection?

Yes. Buyer-nominated inspection is welcome, and SGS, Intertek, Bureau Veritas and TUV may inspect against your purchase order, approved sample and packing list. Issue the checklist and booking instructions early so sample selection and report review fit the 35-50 day production window and the agreed ISO 2859-1 sampling plan.

What does a scheduled production visit cover from start to close-out?

A visit follows the real control flow across our 4,950 m² SGS-verified production floor: programme briefing, material control, cutting and preparation, line execution, special processes, quality records, finishing and packing, then a close-out discussion. Advance scheduling confirms access, protects confidentiality and puts the right technical owners in the room.

How is restricted substance evidence verified for the European market?

European programmes are reviewed against REACH (EC 1907/2006) restricted substance lists, with declarations or laboratory reports matched to the current material and substance list. OEKO-TEX Standard 100 input evidence can support textile claims, and requirements are fixed before sample approval so testing cost appears in the quotation.

How is metal detection controlled on finished goods before packing?

Where a buyer protocol requires it, finished goods pass a needle detector before packing, and any alarm triggers isolation and re-check of the affected batch. The result is recorded with the packing record so the lot released to ISO 2859-1 at AQL 2.5 carries its detection evidence too.